2025

Septic

All Phase - Ready Road Septic

Monroe County, MI

All Phase - Ready Road Septic

An engineered septic design was required for this proposed single-family home due to clay soils and a high water table. The Umlor Group designed a system that met Health Department requirements while avoiding the need for a pumped system. The septic system was designed to blend the raised area seamlessly into the first level of the proposed home.

•  SCOPE OF WORK

  • checked RESIDENTIAL ENGINEERED SEPTIC DESIGN

Let’s Make It Happen.